WORK HAS BEGUN, ONLY 2 APARTMENTS AVAILABLE
Your apartment in the heart of the village of Pomy
The building will include 6 apartments of 4. 5 rooms, distributed over 3 levels and served by a lift.
Apartment of 4. 5 rooms (LOT A3) on the 1st floor, south-west orientation comprising:
- Entrance hall with built-in wardrobe
- Kitchen of 9m2 open to living room
- Stay of 36. 8m2
- A bedroom of 14m2
- A bedroom of 11. 4m2
- A room of 10. 3m2
- A bathroom of 5. 4m2
- A shower room of 3. 1m2
- A 6m2 balcony
- A balcony of 6. 5m2
A cellar and a space for a private washer and dryer column in the laundry room complete this property.
A parking space in the basement as well as two outdoor spaces in addition to the price (Price of the 3 spaces: CHF 65,000. -).
Traditional village architecture, careful construction, heating by heat pump, floor distribution, photovoltaic panels are the technologies used for this construction.
The finishing touches of the apartment will be done at the discretion of the tenant.
Transfer taxes are considerably reduced because they are calculated on the land share
Delivery: around autumn 2025
Don't hesitate, take the plunge and ask for the complete file
Your apartment in the heart of the village of Pomy
The building will include 6 apartments of 4. 5 rooms, distributed over 3 levels and served by a lift.
Apartment of 4. 5 rooms (LOT A3) on the 1st floor, south-west orientation comprising:
- Entrance hall with built-in wardrobe
- Kitchen of 9m2 open to living room
- Stay of 36. 8m2
- A bedroom of 14m2
- A bedroom of 11. 4m2
- A room of 10. 3m2
- A bathroom of 5. 4m2
- A shower room of 3. 1m2
- A 6m2 balcony
- A balcony of 6. 5m2
A cellar and a space for a private washer and dryer column in the laundry room complete this property.
A parking space in the basement as well as two outdoor spaces in addition to the price (Price of the 3 spaces: CHF 65,000. -).
Traditional village architecture, careful construction, heating by heat pump, floor distribution, photovoltaic panels are the technologies used for this construction.
The finishing touches of the apartment will be done at the discretion of the tenant.
Transfer taxes are considerably reduced because they are calculated on the land share
Delivery: around autumn 2025
Don't hesitate, take the plunge and ask for the complete file